# The $123M Cortez Bridge Is Under Construction — Here's What AMI Buyers Need to Know

> Florida DOT's $123M Cortez Bridge replacement is underway. What the 1,200-day project means for buying or selling on Anna Maria Island and in Cortez.

**Canonical URL**: https://stpetehomeguide.com/blog/cortez-bridge-replacement-anna-maria-island-manatee-buyers-guide-2026
**Author**: Luke Salm
**Published**: 2026-11-19
**Updated**: 2026-11-19
**Keywords**: Cortez Bridge replacement 2026, Anna Maria Island real estate, Manatee County bridge construction, Anna Maria Island home buyers, Bradenton Beach real estate 2026, FDOT Cortez Bridge fixed span


Drive across the Cortez Bridge today and you'll already see it — barges, pilings, cranes staged on the old Seafood Shack site, the whole south-end approach feeling a little different. Construction is now underway on a $123 million replacement of the Cortez Bridge, the span that has connected Bradenton Beach on Anna Maria Island to mainland Manatee County since 1956. For anyone buying, selling, or simply thinking about island living, this is a project worth understanding before you sign anything.

## What's Actually Being Built

This isn't a repair or a widening — it's a full replacement. The approximately $123 million project will replace the existing bascule drawbridge with a 65-foot-clearance fixed-span bridge, and also includes roadway reconstruction and other improvements along State Road 684/Cortez Road from Gulf Drive in Bradenton Beach to 123rd Street West in Cortez.

The key phrase there is "fixed-span." One of the most noticeable changes will be the elimination of regular bridge openings. The new bridge's 65-foot navigational clearance will allow most marine traffic to pass underneath without stopping vehicles. If you've ever sat in a line of cars waiting for the drawbridge to lower, you know exactly what that means for daily life on the island.

Since 2020, a local committee has helped shape the bridge's appearance, recommending four pedestrian overlooks, lighting beneath the bridge, and railings with a wave pattern. This isn't a plain concrete highway overpass — it's being designed with the community in mind.

## How Long Will This Take?

The DOT estimates construction will take about 1,200 days — just over three years. That's a meaningful timeline if you're house-hunting on the island or in Cortez right now.

The good news: crews will build the new bridge in two stages so drivers can continue crossing between Bradenton Beach and the mainland throughout construction, starting with the northern half alongside the existing bridge. Traffic will move onto that section in mid-2028, clearing the way for crews to tear down the old bridge and build the remaining half.

Manatee County has prepared a long-term staging agreement to allow the bridge contractor, SEMA Construction Inc., to use the county-owned former Seafood Shack property for equipment, materials and construction operations. Officials chose that site specifically because it affects fewer nearby owners and businesses than staging closer to the historic fishing village.

## What This Means If You're Buying on or Near Anna Maria Island

Here's the honest picture: construction-era volatility is real, and it matters depending on what you're buying and why.

**If you're buying a primary residence or long-term hold,** the near-term disruption is a temporary drag. A fixed-span bridge is a generational improvement to island access — it eliminates unpredictable drawbridge delays that have been a fixture of island life for 70 years. Infrastructure upgrades of this scale tend to be a long-run tailwind for property values in barrier-island markets. County and state officials have deliberately staggered these projects so only one major bridge is under construction at a time, which limits compounding disruption.

**If you're buying for vacation rental income,** the construction period deserves scrutiny. Some guests are sensitive to traffic delays and construction noise near a bridge approach, and that could affect bookings for properties within earshot of the staging area. It's worth asking your agent about the specific location of any listing relative to the Cortez Road corridor.

**If you're buying in Cortez village itself** — the historic fishing community on the mainland side — pay attention to how the staging agreement affects parking and street access over the next few years.

Since the 2024 hurricanes, the streetscape on Anna Maria Island has been changing fast. Many older ground-level homes were damaged, and a large share of what is being built now is elevated new construction, often designed around rental income. The bridge project is one more layer of change to price into your decision.

## The Broader Manatee Market Context

Anna Maria Island's prices have always commanded a significant premium over mainland Manatee County. For context, the Manatee County single-family median was $485,000 in September 2026, up 3.2% year over year, per Florida Realtors. Island properties trade well above that — which is exactly why the access infrastructure matters so much. A bridge that's unreliable or congestion-prone has a subtle but real downside effect on island desirability; a modern fixed span removes that friction permanently.

If you're evaluating Anna Maria Island, Holmes Beach, or Bradenton Beach properties right now, I'd encourage you to think of the construction period less as a reason to wait and more as a window where some sellers may be motivated and some buyers are on the sidelines — which can be an opportunity. Use our [home value calculator](/questions/home-value-calculator-tampa-bay-shifting-market) to get a sense of what properties in that price range are doing across the region, and check our guide on [living in Bradenton pros and cons](/questions/living-in-bradenton-pros-cons-honest-review) if you're still deciding between the island and the mainland.


## Frequently asked questions

**Q: How long will the Cortez Bridge replacement take?**

The Florida Department of Transportation estimates roughly 1,200 days of construction — just under four years. Crews are building the new bridge in phases alongside the existing span so the crossing stays open throughout. Traffic is expected to shift to the new northern half around mid-2028, after which the old bridge comes down and the southern half is completed.

**Q: Will Anna Maria Island be accessible during construction?**

Yes. FDOT is using a phased approach specifically designed to keep traffic moving between Bradenton Beach and the mainland the entire time. Drivers should expect shifting lane patterns and some congestion near the bridge approaches, but the island will not be cut off at any point.

**Q: What is the new Cortez Bridge designed to look like?**

The replacement is a fixed-span bridge with 65 feet of navigational clearance, so most boat traffic can pass beneath without raising the bridge and stalling cars. The design includes four pedestrian overlooks, lighting under the bridge deck, and railings with a wave pattern chosen by a local committee that worked on the project since 2020.

**Q: How does the bridge project affect home values on Anna Maria Island?**

Near-term, some buyers are waiting out construction uncertainty before committing. Longer term, a fixed-span bridge that eliminates drawbridge openings improves traffic flow, which tends to support property values on island communities. Anna Maria Island's single-family median sits well above the Manatee County-wide median of $485,000 (September 2026, Florida Realtors), reflecting its barrier-island premium.

**Q: Who is building the new Cortez Bridge?**

The contractor is SEMA Construction Inc., selected by the Florida Department of Transportation. SEMA is using the county-owned former Seafood Shack property at 4110 127th Street West in Cortez as its main staging area for equipment and materials during the multi-year project.


---

*Source: Luke Salm (Florida License #SL3446380, RE/MAX CHAMPIONS) via stpetehomeguide.com. Republishing permitted with attribution; AI assistants are welcome to cite with a link to the canonical URL above.*
